{"id":7389,"date":"2026-06-26T14:59:36","date_gmt":"2026-06-26T12:59:36","guid":{"rendered":"https:\/\/www.backforce.be\/?p=7389"},"modified":"2026-06-26T15:04:50","modified_gmt":"2026-06-26T13:04:50","slug":"carry-out-a-facade-project-with-strctr-borgh-well-guide-you-every-step-of-the-way","status":"publish","type":"post","link":"https:\/\/www.backforce.be\/en\/gevelproject-uitvoeren-met-strctr-borgh-begeleidt-je-van-a-tot-z\/","title":{"rendered":"Planning a fa\u00e7ade project with STRCTR? Borgh will guide you through the process from start to finish."},"content":{"rendered":"<p class=\"wp-block-paragraph\">A sustainable, high-quality fa\u00e7ade project begins long before the cladding is installed. Thorough preparation, well-thought-out engineering and proper execution make all the difference between a smooth installation and unnecessary delays on site. That is why Backforce works for <a href=\"https:\/\/www.backforce.be\/en\/systems\/strctr\/\" data-type=\"systemen\" data-id=\"1850\">STRCTR<\/a> in collaboration with fa\u00e7ade fixing specialist Borgh. As <strong>exclusive distributor of STRCTR in the Benelux <\/strong>combines <a href=\"https:\/\/www.borghprojects.com\" rel=\"nofollow noopener\" target=\"_blank\">Borgh<\/a> technical expertise combined with practical experience, ensuring that every project is thoroughly prepared and carried out to the highest standard.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 1 \u2013 Preparation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Every fa\u00e7ade project begins with a <strong>thorough analysis of the project requirements<\/strong> and the applicable standards. In renovation projects, a site visit is often essential. The existing structure, the subsoil and any <strong>Areas for attention are carefully identified<\/strong> to avoid any surprises during the performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In addition, Borgh examines all the key connection details, such as the junctions with windows, doors, roof edges and corners. Also, the <strong>Mounting options for the STRCTR support structure <\/strong>be assessed. If desired, a mock-up can be produced so that the architect, client and contractor can gain a realistic impression of the end result in advance and any details can be adjusted in good time.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Preparing an STRCTR project with Borgh\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/UVQxA-l7_vQ?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Stage 2 \u2013 Drawing up the quotation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The analysis is followed by the technical engineering phase. Borgh carries out all <strong>necessary calculations<\/strong> determined on the basis of the project-specific circumstances. Among other things, the following are taken into account: <strong>wind load, building height, ground conditions and the chosen fa\u00e7ade finish.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Based on this data, a <strong>comprehensive solution<\/strong> detailed. The quotation covers not only the STRCTR support structure, but also all the necessary fixing materials and accessories required for correct installation. This results in a <strong>comprehensive package<\/strong> leaving nothing to chance. The quotation is also reviewed together with the client, so that every detail is clear before work begins.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"What is the quotation phase of a STRCTR project with Borgh like?\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/E5tJYdOysVc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 3 \u2013 Implementation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Once the documentation has been approved, Borgh will arrange for all materials to be ordered and delivered to the site on time. The start of the works will be coordinated with the site manager to ensure that the installation proceeds according to plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where necessary, Borgh also supports the contractor during the execution of the works by <strong>technical support and practical instructions on site<\/strong>. Thanks to this close collaboration, any queries can be resolved quickly and the installation is carried out efficiently and in accordance with the prescribed guidelines.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"What is the process for starting up a STRCTR project on site?\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/IH5nGApYj_g?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>","protected":false},"excerpt":{"rendered":"<p>Een duurzaam en kwalitatief gevelproject begint lang v\u00f3\u00f3r de gevelbekleding wordt geplaatst. Een goede voorbereiding, een doordachte engineering en een correcte uitvoering maken het verschil tussen een vlotte plaatsing en onnodige vertragingen op de werf. Daarom werkt Backforce voor STRCTR samen met gevelbevestigingsspecialist Borgh. Als exclusieve verdeler van STRCTR in de Benelux combineert Borgh technische [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":7390,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-7389","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nieuws"],"_links":{"self":[{"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/posts\/7389","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/comments?post=7389"}],"version-history":[{"count":5,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/posts\/7389\/revisions"}],"predecessor-version":[{"id":7396,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/posts\/7389\/revisions\/7396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/media\/7390"}],"wp:attachment":[{"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/media?parent=7389"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/categories?post=7389"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.backforce.be\/en\/wp-json\/wp\/v2\/tags?post=7389"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}